Overview

Finishing Foreman – Civil Building Project Jobs in Ajman, UAE at Sembol Construction

Job Summary:

The Finishing Foreman is responsible for supervising and coordinating all finishing activities on-site for a hospital project. This includes ensuring high-quality workmanship, adherence to project specifications, and compliance with healthcare facility standards, timelines, and safety regulations.

Key Responsibilities:

• Supervise day-to-day finishing works including:

o Plastering, painting, tiling, gypsum works, ceilings, joinery, flooring, and façade finishes

• Ensure all works are executed as per approved drawings, specifications, and method statements

• Coordinate with MEP teams to ensure proper integration of services within finishing works

• Monitor and control workforce productivity, material usage, and work progress

• Conduct regular inspections to ensure quality standards are maintained, especially for hospital-grade finishes

• Ensure compliance with UAE building regulations and hospital/healthcare standards (e.g., hygiene, infection control requirements)

• Identify and resolve site issues, including clashes and rework requirements

• Ensure proper handling and storage of finishing materials to avoid damage and wastage

• Coordinate with QA/QC team for inspections, snagging, and handover processes

• Maintain site safety standards and ensure workers follow HSE policies

• Prepare daily progress reports and update supervisors on work status

Title: Finishing Foreman – Civil Building Project

Company: Sembol Construction

Location: Ajman, UAE

 

Upload your CV/resume or any other relevant file. Max. file size: 800 MB.